This job was for a pair of pipe work skids so our customer could pre-install straight onto site. Various hollow sections and channel made up the frame and durbar made the floor. Uninstrut welded in after allowed all the necessary pipework and instrumentation a place to hang. All EN 1090 compliant and a happy customer.
All of our EN 1090 jobs will come with a job pack including all relevant material and welding wire certs, plant calibration certificate, as well as the certificate of the welder who completes your job.